GWS Tech Service GmbH – A small glimpse behind the scenes
In the last few weeks, GWS Tech colleagues have been on the road on 11 construction sites to check load handling equipment, tools and accessories. The volume of the order was so high that some tests had to be postponed to the next few months due to insufficient time capacities. Even under time pressure, everything has to be checked conscientiously and down to the smallest detail. As a counterbalance, for example, you can enjoy the evening after work at a meal with colleagues.